Brewing Projects ================= Brewing Gear ------------- * Keggle * Cut Off Top * Create Lid * Internal Volume Markings * Pour Valve * Sight Glass * Polish Fermenting Gear ---------------- * Airlock Fermentation Monitor * IR Sensor Method * 3 Wire Method - https://community.particle.io/t/fermenting-beer-bubble-counter/2523/9 * Float Switch Method * Corny Keg Fermentor/Secondary Air Lock * Gas Side Connection * Tubing * Airlock * Spunding Valve * Gas Side Connection * Adjustable Pressure Relief Valve (0-50 psi range = Up to 3.7 Volumes of CO2) * Pressure Valve (0-50 psi range) * Plumbing Fittings * Glycol Chiller #. Acquire Window A/C Unit and Pump #. Install Service Valve #. Remove R2 or Refrigerant #. Build Cool Side Heat Exchanger Enclosure #. Braze in Cool Side Coils #. Check for Leaks #. Refill with Refrigerant #. Check Cooling Capacity * Cool water bath (for external chilling) * 55 Gal Drum (?) with fittings to recirculate water * Internal Dimensions (Approximately) 22.5" Diameter, 34" Height * 1/2 BBL Keg Dimensions (Approx.) 16" Diameter, 24" Height * Could accomodate 1/2 BBL Keg Converted Conical Fermentor * Smaller Water Bath for Corny Keg Fermentor, 6 Gal Glass Fermentor * Kvwikstokk - * http://poppylandbrewer.blogspot.com/2016/01/making-yeast-ring.html * http://www.garshol.priv.no/blog/380.html * https://www.theyeastbay.com/brewers-yeast-products/sigmunds-voss-kveik Kegerator and Serving Gear --------------------------- * Martin Luther Picture * Gas * External CO2 Tank * External Pressure Gauge * External Flow Rate Gauge * Nitrogen System * Tank * Distributor * Regulator * New Serving Tower * 2-3 in Steel Pipe (?) * Weld Custom (?) * Cold Airflow through Tower * Inset Drip Tray & Drain * Bottle Wax * 20 AP Glue Sticks to 10-12 Same Color Crayons * 3 Mini Hot Glue Sticks to 1 Crayon * Tap Handles * Skeleton Key * Laser Cut * Baseball * Chain Link (Welded) * Dice Drilled & Glued * Alphabet Blocks * Wrench * Wrench (Heat and Twist) * ReBar Cactus * Dummy Grenade * Railroad Spike